IDNUAGEIDNUAGE.
← Portfolio

Groupe Alphard Pre-Operational Verification App

Pre-operational verification (POV) application for engineers at a consulting engineering firm, used to validate industrial equipment operation before commissioning.

Project completed as software project manager and full-stack developer at Groupe Alphard and Alboréa.

Project anatomy

Pre-operational checks of industrial equipment, tracked in a single app.

  1. 01 · Interface

    A test list for each piece of equipment.

    Test lists adapt to each piece of equipment and each project.

  2. 02 · Timeline

    Every check, in order.

    Chronological check management eliminates omissions during inspections.

  3. 03 · Deficiencies

    Deficiencies, documented.

    Identified deficiencies are recorded, easing handover between verification, maintenance and operations.

  4. 04 · Data

    A REST API and a relational database.

    LoopBack API on Node.js, with PostgreSQL.

  5. 05 · Platform

    Hosted on DigitalOcean.

    With OIDC authentication.

Every layer, back together.

Challenge

Engineers and technicians had to manually manage industrial equipment checklists, making deficiency tracking difficult and risking omissions during inspections.

Solution

Development of an application with an activity tracking dashboard, equipment and project-specific test lists, chronological verification management and documentation of identified deficiencies.

Results

Elimination of omissions through chronological tracking. Facilitated knowledge transfer between verification, maintenance and operations teams.

Related service: Web apps & intranets

Contact IDNUAGE